Shipping Glossary
Through FreightWay of transport consisting of several stages, wherein the stages only comprise transport by sea. Hapag-Lloyd consider the following areas to be through freight areas: Scandinavia, Eastern Europe, Iberia and Africa |
Through RateThe total rate from the port of origin to final destination |
Throughput ChargeThe charge for moving a container through a container yard off or onto a ship |
Tidal HarbourHarbour whose harbour basin directly opens into the sea entrance and which is thus subject to the influence of the tides. Its capacity for loading and unloading big ships can vary accordingly. Opposite: dock harbour |
Tidal RangeDifference in water level between high tide and low tide |
TIDE1. Term for ebb and flow. 2. Regular change in sea level of most seas by intervals of about 6 hours |
TIERDivision of the container ship from bottom to top in vertical layers which are numbered from the bottom up to the hatch cover and from the hatch upwards. The tier is used as a parameter for indicating the stowage position of a container in the ship |
TIFTEMPORARY INCENTIVE CRG. |
Time CharterA contract for leasing between ship owners and the lessee. It would state the duration of the lease in years or voyages |
Time DraftA draft that matures either a certain number of days after acceptance or a certain number of days after the date of the draft |